• Low Cost Prefab Building, Prefabricated Steel Frame Workshop (SSW-228)
  • Low Cost Prefab Building, Prefabricated Steel Frame Workshop (SSW-228)

Low Cost Prefab Building, Prefabricated Steel Frame Workshop (SSW-228)

Life Time: Within 50 Years
material: Q345 and Q235
Certification: ISO9001:2000,SGS,BV,Ce
Cladding: Steel Sheet
Transport Package: Export Standard Package or According to Customer′s
Specification: ISO9001: 2000
Customization:
Diamond Member Since 2007

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
SSW-228
Trademark
XGZ
Origin
Qingdao, Shandong, China
HS Code
9406000090
Production Capacity
20000 Ton Per Year

Product Description

1. Prefabricated Steel Frame Workshop
2. Material: Q345B or Q235B
3. Easy to install and maintain
4. Recycling
Low Cost Prefab Building, Prefabricated Steel Frame Workshop (SSW-228)

Prefabricated Steel Frame Workshop

We're a manufacturer of steel structure in qingdao, we have a professional team, who can produce, install and so on. Besides, our excellent engineers can design the drawings according to your requirement.

1) Certificate: ISO9001: 2000
2) Materials: Q235 & Q345
3) Design: According to customer's requirement.
4) Manufacture with high quality control.
5) Engineers help instruct installation.
6) Easy to assemble and dismantle.
7) Main components: H beam/C purlin /Z purlin/sandwich panel/ corrugated steel sheet
8) Life: Over 50 years
9) Nice appearance, easy to maintenance.
10) The price would be different due to different quantity /size/design/raw material grade, etc.
 
                                         Advantages
 Faster Occupancy  Single source responsibility
 Lower cost  Flexibility in expansion
 Large clear spans  Quality control
 Low maintenance  Energy efficient roof and wall systems
 Architectural versatility  Optimized design of steel reducing weight
 Quick delivery and Quick turn-key construction.  Water-tight roofs & wall coverings
 Pre-painted and has low maintenance requirement.  The building can be dismantled and relocated easily.
 Clear spans up to 100m without internal columns  Flexibility in building dimensions
 Fixed deadlines and costs  
 Weather-tight roof and wall coverings with accessories for long maintenance free exteriors.
Low Cost Prefab Building, Prefabricated Steel Frame Workshop (SSW-228)

New packing method:
Low Cost Prefab Building, Prefabricated Steel Frame Workshop (SSW-228)

Our new loading method use steel plate, this will be very convenient for the client to unload the goods:
• Unload all goods of one 40HQ container will be shorted to 15 minutes with the help of truck, while the old loading method will take hours even days to unload one container's goods, will save a lot on unloading cost;
• Use steel pallet also will prevent the damage to the steel frame during unloading the goods;
• Use steel pallet also can increase the loading quantity of one shipping container so that can save shipping containers;

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2007

Suppliers with verified business licenses

Manufacturer/Factory
Number of Employees
912
Year of Establishment
2002-06-13