This product is no longer promoted on Made-in-China.com. If you find any infringement or sensitive information of it, please contact us for handling. Thank you.

Steel Structure Chicken House (SCH-16127)

Diamond Member Since 2007

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
CL-1229007
Height
>2.1m
Steel Surface
Galvanize or Painted
Life Time
50 Years
Transport Package
Standard Package
Specification
ISO, SGS
Trademark
XGZ
Origin
Qingdao, China
HS Code
9406
Production Capacity
2000t/Month

Product Description

Prefab Poultry House is easy to manage and the market is on your doorstep. A well managed chicken house is very profitable, no matter it is poultry broiler or layer house. Poultry housing can be as crude or elaborate as you wish to build as long as you provide the following:

1. Protection
2. Adequate Space
3. Easy Access to Feed and Water
4. Source of Light:
5. Ventilation
6. Appearance
7. Use Common Sense
Qingdao Xinguangzheng Steel Structure Co., Ltd
House length (m) 38.1 House width (m) 12
 
feeding line 3 Birds/m² 14
 
Water line 4 Birds/pan 44.33
 
Front & back passage(m) 3 Birds/nipple 11.08
 
Set 1 Feeding days 45 days harvest
 

 
SUMMARY
 

 
Name Qty
 

 
1. Main Feed Line System 1
 

 
2.   Feed Pan system 1
 

 
3.  Nipple Drinking System 1
 

 
4.Environment controller 1
 



FAQ:
1. What is steel prefabricated house mean and made of?
RE: Steel prefabricated houses are made of high grade painted steel frame/structure as strong  skeleton and lined with sandwich panel as wall and roof, these are pre-designed and manufatured in the factory and later assembled on site.
2. Is it safe and can suit to any kind of stringent weather conditions?
RE: Our houses could resistant earthquake, wind, snow, etc.

3. Can you supply design service?
RE: Yes.also supply design service.

4. What is the payment terms?
RE: a) T/T, 30% deposit and other payment  will be payed when you receive the ocean bill.
b) 100% L/C at sight

5. How long is delivery?
RE: Generally, the delivery time of sandwich panel is within 7 days; and 30 days for prefabricated house. The exact delivery time should depend on the quantity and confirm with factories.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2007

Suppliers with verified business licenses

Manufacturer/Factory
Number of Employees
912
Year of Establishment
2002-06-13