• Prefabricated Steel Structure Workshop for Factory Building
  • Prefabricated Steel Structure Workshop for Factory Building
  • Prefabricated Steel Structure Workshop for Factory Building
  • Prefabricated Steel Structure Workshop for Factory Building
  • Prefabricated Steel Structure Workshop for Factory Building
  • Prefabricated Steel Structure Workshop for Factory Building

Prefabricated Steel Structure Workshop for Factory Building

Usage: Warehouse, Villa, Dormitories, Temporary Offices, Workshop
Design Load: Wind Load, Snow Load, Earthquake
Main Steel: Welded H Steel, Hot Rolled Steel
Surface Treatment: Painting, Galvanization
Roof & Wall: Single Skind Steel Sheet; Insulation Panel
Color: Follow Ral Color Chart
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2007

Suppliers with verified business licenses

Manufacturer/Factory
  • Overview
  • Who We Are
  • What We Do
Overview

Basic Info.

Model NO.
1091
Lead Time
30-45 Days
Material
Steel Structure
Certification
ISO, CE, SGS, TUV
Customized
Customized
After-sales Service
Fabrication Service
Warranty
Life Circle Time
Transport Package
Steel Pallet
Specification
ISO, SGS, BV, TUV, CE
Trademark
XGZ
Origin
Qingdao, China
HS Code
940690
Production Capacity
2000t/Month/Workshop(5 Workshops Totally)

Product Description

Who We Are

1200 workers, 360000sqm production workshop, 25 years experience, CE, ISO9001, ISO9712, ISO3834, BV, SGS certificated, one hour to Qingdao port, 110+countries, our company, as a leading and professsional manufacture, this is how we keep good quality and competitive prices for global valued customers.

Need help with the design of your New Warehouse Steel Structure Building? Please give us a call or drop us an email and one of our team will be happy to help you.
Our team are standing by to help.

 

Supply One-Stop Service: Designing, Fabrication and Installation 

Our excellent design team will provide steel structure solutions for you. 

1. Location (where will be built? ) _____country&area
2. Size: Length*width*height _____mm*_____mm*_____mm
3. Wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s
4. Snow load (max. Snow height)_____kn/m2, _____mm
5. Brick wall: If yes, ______mm high
6. Insulation option: EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested

7. No need insulation: color-coated steel sheets will be considered
8. Door quantity: _____units
9. Window quantity:_____units
10. Crane: If yes, _____sets, max. Lifting weight____tons; Max. Lifting height _____m
 

What We Do

Prefabricated Steel Structure Workshop for Factory BuildingPrefabricated Steel Structure Workshop for Factory Building

Package Steel Pallet packed steel structure Delivery Time 30-45days
Supply Ability 20,000ton/year Payment Terms T/T,L/C
Main Structure Portal Frame Secondary Structure Galvanized Purlins
Cladding Steel sheeting, steel sandwich panel Windows Aluminum alloy window
Doors Roller door, Sectional door, Steel door Certification ISO/CE/SGS/TUV/BV
Mezzanine, Office, Glass Curtain Wall, Aluminum Composite Panel Decoration
Place of Origin Qingdao, China Brand Name XGZ
Prefabricated Steel Structure Workshop for Factory BuildingPrefabricated Steel Structure Workshop for Factory BuildingPrefabricated Steel Structure Workshop for Factory Building

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2007

Suppliers with verified business licenses

Manufacturer/Factory
Number of Employees
912
Year of Establishment
2002-06-13