Customization: | Available |
---|---|
After-sales Service: | Production, Installation, After-Sale Service |
Layers: | Multi-Layer |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Main Steel Frame | H section steel | Q355 steel 8mm~20mm |
Welding | Automatic submerged arc welding | |
Rust removal | Sandblasting | |
Surface processing | Alkyd paint or galvanized | |
High-strength bolts | Grade 10.9 | |
Bracing System | Knee brace(Angle steel) | L50x4, Steel Q235, processed and painted |
Horizontal/Column bracing | Φ20, Steel Q235, processed and painted | |
Tie rod | Φ89*3, Steel Q235, processed and painted | |
Small brace | Φ12, Steel Q235, processed and painted | |
Standard bolt | Galvanized bolt | |
Roof | Purlin | C160*60*2.5 galvanized or painted |
Roof panel | Sandwich panel or corrugated steel plate | |
Transparent lighting panel | 1.5 mm FRP | |
Accessories | Glass cement, self-tapping screws, etc. | |
Trimmings | Made from 0.5mm thick, colored sheet steel | |
Gutter | Made from 1.0mm thick galvanized steel sheet | |
Downpipe | Φ110PVC | |
Walls | Purlin | C160*60*2.5 galvanized or painted |
Wall | sandwich panel or corrugated steel plate | |
Accessories | Glass cement, self-tapping screws, etc. | |
Trimmings | Made from 0.5mm thick, colored sheet steel | |
Axial fan | Axial fan | |
Doors & windows | Rolling door/sliding door PVC/Alu/steel window |
Steel Structure Construction Characteristics
1. Environmentally friendly, no waste produced
2. Flexibility when fixing doors, windows, and interior partitions
3. Beautiful appearance, different colors for the walls and roof.
4. Cost saving and convenient to transport
5. Rustproof with generally more than 15 years service life
6. Safe and stable, can withstand a grade 8 earthquake
Application
- Residential buildings
- Commercial buildings
- Garages buildings
- Industrial buildings
- Commercial buildings
- Manufacturing Plants
- Prefabricated buildings
- Storage buildings
- Suburban buildings
- Warehouses
- Workshops
Please kindly inform us of the information below if you are interested in our products.
1. Project Progress: Is Land Purchased? Is it licensed by the government?
2. Usage: for warehouse, workshop, showroom, etc.
3. Location: In which country will it be built?
4. Local Climate: Wind speed, Snow load (max. Wind speed)
5. Design: Please provide the design drawing. Or do you need us to design for you?
6. Dimension: Length*width*height
7. Crane Beam: Do you need crane beam inside the steel structure?
8. Roof and Wall: determine the panel material, such as color steel panel, and metal sandwich panel.
9. Windows and Doors: what material, quantity, and type?
DESIGN
Our team of steel structure design experts work with you to define your project balancing scope and budget. Within that process we will provide scope drawings, budget confirmation, and schedule. Each building is customized to provide lasting, maintenance-free value.
ENGINEER
After your design is finalized it is submitted to engineering. The engineering team will evaluate the structure to ensure it meets the design criteria and local code requirements. Once complete they will prepare final drawings and ready the plans for fabrication.
FABRICATE
steel buildings come pre-cut, pre-drilled, and ready for onsite assembly. Our fabrication process ensures the fabricated materials are cut to specification, packaged ready to for delivery by ship.
DELIVER
Before a building is delivered our logistics professionals will verify bill of materials quantities at the factory.
SUPPORT
We fabricate all structures to be erected on site by yourself or a professional. Regardless, our project management team will be ready to support you through completion until the last piece of trim is installed.