Customization: | Available |
---|---|
Connection Form: | Bolt Connection |
Building Application: | Workshop, Warehouse, Chicken Farm, Pig Shed |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Prefabricated Steel Structure Buildings | Conventional Building |
Higher resistance to seismic forces due to light weight flexible frames | Rigid heavy weight structures not suitable for seismic zones |
Reduced time because of international design standards & codes using standard sections and connections | Increased design time due to scratch and availability of less design aids |
30% less PEB steel structures weight through efficient use of steel | High weight due to excessive safety factor and the usage of heavier steel sections |
Factory controlled quality | Every project to be fabricated at site |
Lower initial cost of peb steel buildings(cost per square meter about 30% less than the conventional) and faster delivery | Special design and features developed for each project at higher costs |
Simple Foundation, easy to construct and light weight of PEB structures | Extensive heavy foundation |
Average delivery time 4-8 weeks | Average delivery time 22-28 weeks |