Steel Structure Workshop/Light steel structure warehouse
1. Roof: Color-coated Corrugated Steel Sheet with skylight panel
2. Wall: Color-coated Corrugated Steel Sheet
3. Main Steel Framework: Steel Column, Beam, Purlin and other supporting parts with shot blasting and painting process.
4. Material: Q345
5. Window: Plastic Steel Window
6. Door: Sliding Door plus Canopy (all are made by sandwich panel)
7. PVC Downpipe
No. |
Type |
steel structure |
1 |
Material |
Main steel strucrure--Q345/Q235 Secondary steel structure--Q235 |
3 |
Roof and Wall |
Option: Steel sheet,EPS, glass wool, rock wool or PU sandwich panel |
4 |
Door and Window |
PVC or Aluminum alloy; sliding door or rolled door |
5 |
Column and Beam |
Option: Welded H section |
6 |
Purlin |
Option: C-section or Z-section |
7 |
Local Climate |
1. Wind speed |
8 |
|
2. Snow load |
9 |
|
3. Rain quantity |
10 |
|
4. Earthquake grade if have |
11 |
|
More details is preferred. |
12 |
Drawing |
1. according to clients' drawing |
13 |
|
2. design as per clients' dimension and requests |
14 |
Package |
Naked loaded in shipping container or as per requests. |
15 |
Loading |
20 GP, 40HP, 40 GP, 40 OT |
FAQ:
1. What is steel prefabricated house mean and made of?
RE: Steel prefabricated houses are made of high grade painted steel frame/structure as strong skeleton and lined with sandwich panel as wall and roof, these are pre-designed and manufatured in the factory and later assembled on site.
2. Is it safe and can suit to any kind of stringent weather conditions?
RE: Our houses could resistant earthquake, wind, snow, etc.
3. Can you supply design service?
RE: Yes.also supply design service.
4. What is the payment terms?
RE: a) T/T, 30% deposit and other payment will be payed when you receive the ocean bill.
b) 100% L/C at sight
5. How long is delivery?
RE: Generally, the delivery time of sandwich panel is within 7 days; and 30 days for prefabricated house. The exact delivery time should depend on the quantity and confirm with factories.