Advantages of pre engineered buildings:
FASTER OCCUPANCY
MORE ECONOMIC THAN CONVENTIONAL STRUCTURES
SINGLE SOURCE RESPONSIBILITY
LOWER COST
FLEXIBILITY IN EXPANSION
LARGE CLEAR SPANS
QUALITY CONTROL
LOW MAINTENANCE
ENERGY EFFICIENT ROOF AND WALL SYSTEMS
ARCHITECTURAL VERSATALITY
Applications of Pre Engineered Building Systems:
In view of many advantages of Pre Engineered Buildings over other types of buildings & structures, they are ideally suited for almost all types of medium to large size steel buildings. Whenever and wherever one or more factors like faster occupancy, large clear spans, excellent aesthetics, corrosion resistance, better load bearing capacity against high wind/ seismic loads, etc are important, then PEBs are the most obvious and preferred choice world over.
Advantages |
1. design according to customers' requirements |
2. manufacture under complete quality control system---ISO9001 |
3. installation with instruction of experienced engineers |
4. easy to assemble and dismantle |
5. eco-friendly material: can be used for several times and can be recycled |
6. shorter construction period, longer using time |
7. high strength and stiffness, high weight bearing. |
8. sound insulation and heat insulation; antisepsis and damp proofing; waterproof and anti-seismic |
Main components |
Main frame |
H Section Steels |
Purlin |
C or Z section steel profiles |
Brace |
Ordinary with high strength bolt |
Roof &wall |
EPS, Rock wool , Glass wool, PU, Corrugated Steel Sheet |
Door |
Sliding or rolling door |
Insulation panel |
EPS, Rock wool , Glass wool, PU Sandwich Panel |
Material |
Q235B,Q345B China Steel Grade |
Sheet |
0.3mm-0.6mm galvanized steel sheet |
FAQ:
1. What is steel prefabricated house mean and made of?
RE: Steel prefabricated houses are made of high grade painted steel frame/structure as strong skeleton and lined with sandwich panel as wall and roof, these are pre-designed and manufatured in the factory and later assembled on site.
2. Is it safe and can suit to any kind of stringent weather conditions?
RE: Our houses could resistant earthquake, wind, snow, etc.
3. Can you supply design service?
RE: Yes.also supply design service.
4. What is the payment terms?
RE: a) T/T, 30% deposit and other payment will be payed when you receive the ocean bill.
b) 100% L/C at sight
5. How long is delivery?
RE: Generally, the delivery time of sandwich panel is within 7 days; and 30 days for prefabricated house. The exact delivery time should depend on the quantity and confirm with factories.