Prefab Hot-DIP Glvanized Steel Structure Building for Storage and Fabrication Workshop

Product Details
Customization: Available
After-sales Service: Production, Installation, After-Sale Service
Layers: Multi-Layer
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2007

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
912
Year of Establishment
2002-06-13
  • Prefab Hot-DIP Glvanized Steel Structure Building for Storage and Fabrication Workshop
  • Prefab Hot-DIP Glvanized Steel Structure Building for Storage and Fabrication Workshop
  • Prefab Hot-DIP Glvanized Steel Structure Building for Storage and Fabrication Workshop
  • Prefab Hot-DIP Glvanized Steel Structure Building for Storage and Fabrication Workshop
  • Prefab Hot-DIP Glvanized Steel Structure Building for Storage and Fabrication Workshop
  • Prefab Hot-DIP Glvanized Steel Structure Building for Storage and Fabrication Workshop
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Production Process
  • Why Choose Us
  • Company Profile
  • Certifications
  • FAQ
  • Concrete Case
Overview

Basic Info.

Model NO.
XGZWS-58
Usage
Dust-Proof Workshop, Electrostatic Workshop, Food And Chemical Industry, Heavy Industry, High-Voltage Power Plant, Research Facility, Specialized Workshop, Textile And Electronic Processing, Warehouse
Transport Package
Standard Package
Specification
ISO, SGS, BV, TUV, CE
Trademark
XGZ
Origin
Qingdao, China
HS Code
9406000090
Production Capacity
2000t/Month/Workshop (5 Workshops Totally)

Packaging & Delivery

Package Size
11000.00cm * 2300.00cm * 2500.00cm
Package Gross Weight
23000.000kg

Product Description


Prefab Hot-DIP Glvanized Steel Structure Building for Storage and Fabrication Workshop
Product Description

 

Prefab Hot-DIP Glvanized Steel Structure Building for Storage and Fabrication Workshop
Detailed Photos
 

Prefab Hot-DIP Glvanized Steel Structure Building for Storage and Fabrication Workshop

Main Steel Frame H section steel Q355 steel 8mm~20mm
  Welding Automatic submerged arc welding
  Rust removal Sandblasting
  Surface processing Alkyd paint or galvanized
  High-strength bolts Grade 10.9
Bracing System Knee brace(Angle steel) L50x4, Steel Q235, processed and painted
  Horizontal/Column bracing Φ20, Steel Q235, processed and painted
  Tie rod Φ89*3, Steel Q235, processed and painted
  Small brace Φ12, Steel Q235, processed and painted
  Standard bolt Galvanized bolt
Roof Purlin C160*60*2.5 galvanized or painted
  Roof panel Sandwich panel or corrugated steel plate
  Transparent lighting panel 1.5 mm FRP
  Accessories Glass cement, self-tapping screws, etc.
  Trimmings Made from 0.5mm thick, colored sheet steel
  Gutter Made from 1.0mm thick galvanized steel sheet
  Downpipe Φ110PVC
Walls Purlin C160*60*2.5 galvanized or painted
  Wall sandwich panel or corrugated steel plate
  Accessories Glass cement, self-tapping screws, etc.
  Trimmings Made from 0.5mm thick, colored sheet steel
  Axial fan Axial fan
  Doors & windows Rolling door/sliding door PVC/Alu/steel window
 
Production Process

 

Prefab Hot-DIP Glvanized Steel Structure Building for Storage and Fabrication Workshop
Why Choose Us

1. Professional
We thoroughly inspect our machinery and equipment before each production starts to ensure the equipment's performance meets the specific construction requirements. At the same time, we test all the finished products for the first time, with very high requirements for quality and precision. Many domestic customers look to us for our professional work and the higher quality in comparison.
2. Professional Team
Our designers and building engineers graduated from famous Chinese universities with strong professional knowledge and more than fifteen years of working experience.
3. Quality Assurance
We use high-quality raw materials that you can compare with any manufacturer.
4. Strict Management Pattern
Our company is organized and disciplined, always pursuing rigorous work. Meetings are held every month to solve problems that arise in the production process, and finally achieve zero mistakes in the project.
5. Advanced Equipment
We have a mature production line, using world-class production equipment, fully automatic production, high production efficiency, high quality, and zero errors. The production process is rigorous and efficient.
6. Experienced
We are a trustworthy manufacturer, we have done more than 50 projects, and the government and enterprises are our partners. And because of our high-quality products and efficient professional team, many enterprises and government departments have cooperated with us many times.
7. After-Sale Service
We can provide installation videos, sketches, or our engineers to guide you in person.

 


Company Profile

Prefab Hot-DIP Glvanized Steel Structure Building for Storage and Fabrication Workshop

 Qingdao Xinguangzheng Steel Structure Co., Ltd, founded in 1997, is now the first steel structure listed company (New OTCMarket) of Qingdao after a 20-year stable development. It is the group member unit of China Steel Structure Association; the member  of China Construction Metal Structure Association; committee unit of China Chamber of InternationalCommerce, and is rated as Credit enterprise (class AAA) by Ministry of Commerce and SASAC of PRC. It has also been listedinto the Modern Production Base of Construction Industry in Shandong Province and has achieved the honor of famousmark of Shandong Province.

Due to its powerful technique and rich engineering experience, XGZ has achieved National Professional Contractors forsteel structure projects (class A); anti-water, anti rust and thermal insulation; architectural decoration; ProfessionalContractors for  architectural curtain wall (Class B), EN1090 Certification (CE); Global normal steel structure advanced certifi-cate (EXC-3).  XGZ has now become a high-tech, diversified and export oriented international private enterprise  integratingR&D, design,  production, installation construction and service. XGZ has joined in many constructional projects: Haier,Hisense, Sinopec, airport, subway; and has cooperated with large enterprises like CSCEC and Powerchina.


We have chosen the industrial mode of " Steel Structure+" under the guidance of global market; created our own corpo-rate culture system; cooperated with Universities and Institutions; brought in numerous senior technical clerks; optimizedour own organizational chart in form of wheel axis; established informationized ERP management. We have also innovatedautomated welding- and NC equipments; built an elaborate ISO9001 quality control system prior to our counterparts;passed the third-party Certification. We supply our clients consistently with high quality products as well as service.

The group embrace the corporate mission of "social responsibility, enterprise oriented, team-focused,create wealth and self improvements"

Prefab Hot-DIP Glvanized Steel Structure Building for Storage and Fabrication WorkshopPrefab Hot-DIP Glvanized Steel Structure Building for Storage and Fabrication Workshop
Certifications

Prefab Hot-DIP Glvanized Steel Structure Building for Storage and Fabrication WorkshopPrefab Hot-DIP Glvanized Steel Structure Building for Storage and Fabrication Workshop

FAQ
 

Q1: How long does it take to get my building?
A: Lead time is vary, but typically 2 weeks of drawings and 6-8 weeks for delivery(depending on complexity)

Q2: What are the benefits of steel construction?

A: 1-Durable and with long lifespan.
2-Short construction period than concrete and wooden building.
3-Low cost and reusable.
4-High strength and light weight, has good seismic performance.
5-Widely used for multi-purpose buildings.

Q3: Why choose XGZ ?

A: At XGZ, the customer is the first priority. We don't pull any gimmicks. We are veteran owned and
operated business, unmatched in customer service. We have more than 20 years of metal building experience. We are also very reputable manufacture and can answer your questions regarding any tape of construction project.We care about your needs and value your business.

Q4: How can l get the quotation of the project?

A: lf you have the drawing, we can offer you our quotation accordingly. lf youhave no design, our engineer will design for you to confirm. And then offer you a quotation.

Q5: Do you offer designing service for us?

A: Yes, we can provide full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (X steel) and etc. We can design complex industrial building like office building,
supermarket, auto dealer shop, shipping mall, hotel etc.

Q6: Do you provide samples?

A: Yes, we could offer the sample for free but do not pay for the cost of transportation.

Q7: What is your terms of payment ?

A: L/C, T/T, and Western Union.

Q8: How about your quality control?

A: We have our own professional quality control team with rich experience and advanced inspection equipment. Also we are willing to accept any other the third inspection part to control.

Q9: Can you provide the installation help?

A: We will provide detailed instruction photos and videos to you. If it is necessary,we will send professional engineers to do the construction guidance, and some skilled workers to help for installation. However, the visa fee, air tickets,accommodation, wages will be provided by buyers.

 

Concrete Case

Prefab Hot-DIP Glvanized Steel Structure Building for Storage and Fabrication Workshop

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now