Customization: | Available |
---|---|
Type: | H-Section Steel |
Material: | Z/C Section Steel/ H Beam |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Main Steel: Column and beam(H-section), square steel tube,C/Z purlin
Conection Method: Welding or hot rolled or cold rolledSpecifications |
1) Different sizes: MOQ is 100m2, width X length X eave height |
2) Different types: Single slope double slope Sing span double-span Multi-span single floor, double floors |
|
3) Different Bases: Cement and steel foundation bolts |
|
4) Different Columns and Beams: Material Q355(S355JR)or Q235(S235JR) steel, all bolt connections, Straight cross-section or Variable cross-section |
|
5) Different bracings: X-type or V-type or other type bracing made from angle, round pipe, etc |
|
6) Different Purlins: C or z type: Size from C120~C320, Z100~Z200 |
|
7) Different Roof and Wall Panel: Single colorful corrugated steel sheet 0.326~0.8mm thick, (1150mm wide), or sandwich panel with EPS, ROCK WOOL, PU etc insulation thickness around 50mm~100mm |
|
8) All accessories: Semi-transparent skylight belts, Ventilators, down pipe, Galvanized gutter, etc |
|
9) Surface: Two lays of Anti-Rust Paint |
|
10) Packing: Main steel frame without packing load in 40'OT, roof and wall panel load in 40'HQ |
Design Parameters |
1) Live load on roof (KN/M2) |
2) Wind speed (KM/H) |
|
3) Snow load (KG/M2) - If Applicable |
|
4) Earthquake load - If Applicable |
|
5) Style of Doors and Windows |
|
6) Crane (if you have), Crane span, Crane lift height, max lift capacity, max wheel pressure and min wheel pressure |
|
7) Size: width X length X eave height, roof slope |
|
8) Or your idea! |
1. Our prefab steel warehouse is fast and easy erection. Installation with no errors because we adopts pre-installation before we ship the steel structure to ensure the quality of our steel structure products
2. The advanced design can decrease much of the work for civil construction design and shorten the constructing period. Almost no welding at the spot can make the installation much quicker.