• Pre Engineered Steel Structure Workshop for Production
  • Pre Engineered Steel Structure Workshop for Production
  • Pre Engineered Steel Structure Workshop for Production
  • Pre Engineered Steel Structure Workshop for Production
  • Pre Engineered Steel Structure Workshop for Production
  • Pre Engineered Steel Structure Workshop for Production

Pre Engineered Steel Structure Workshop for Production

After-sales Service: Installation Instruction Manual
Material: Steel Structure
Usage: Warehouse, Workshop
Certification: ISO, CE
Customized: Customized
Building Application: Workshop, Warehouse, Logistics, Cold Storage
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2007

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
xgz202211
Design Data
Wind Load, Snow Load
Steel Structure
Column, Beam, Purlins
Steel Grade
Q235, Q355
Cladding
Steel Sheet, Sandwich Panel
Connection
Bolt Connection
Lead Time
30-45days After Shop Drawings
Transport Package
Standard Package
Specification
ISO, SGS, BV
Trademark
XGZ
Origin
Qingdao, China
HS Code
9406900090
Production Capacity
20000ton Per Year

Product Description

We have found that what initially peaks our customers' interests is how low steel building prices are. But after this they are usually pleasantly surprised with how customizable our prefabricated steel structure buildings can be. Having dealt with other pre-engineered metal building manufactures before, our expertise and knowledge usually comes as a breathe of fresh air. Essentially anything that you desire can be done with our prefabricated buildings. The reason for this is because of the clear span design that we employee, which gives you free range over the interior of your structure.

A few things to keep in mind when customizing prefabricated industrial steel buildings are:
All customization requests can be added at the time of order placement.
When providing measurements for your customizations, please ensure that they are accurate.
The cost of customizations will add to the cost of basic steel building prices.
No. Item Steel Structure Building For Production Workshop
1 Material Grade Q235, Q355
2 Produce Lead time 30-45days after shop drawing confirmation
3 Quality Certification ISO/CE/SGS/TUV/BV
4 Specification Building Size Width * Length * Eave Height
5 Main components Base Concrete plus anchor bolts
6 Main Frame Steel column and beam: welded H section steels, hot rolled steels
Painting & Galvanization
7 Secondary Structure Bracing, knee bracing, purlins, roof and wall support, steel pipe
8 Bolt Galvanized bolt, High-strength bolt, Self-tapping screw
9 Roof & Wall PU sandwich panel, Rock wool sandwich panel, Fiberglass sandwich panel, Corrugated steel sheet
10 Door Sliding door, Roller door, Sectional door, Steel door
11 Window Aluminum alloy window, PVC window
12 Accessories Skylight panel, ventilators, down pipe, gutter, flashing
13 Surface treatment options Alkyd painting (grey, white, blue, brown, engineering yellow)
Epoxy painting
14 Application 1. Steel workshop, warehouse steel structure, steel structure factory, logistics warehouse, hangar, cold storage warehouse
15 2. High rise steel building solution
16 3. Agriculture steel building for animal husbandry, slaughter, feed mill
17 4. Commercial steel building for gym, arena
18 Package & Delivery Steel pallet in 40GP, 40HC, 40OT

 Pre Engineered Steel Structure Workshop for Production
Pre Engineered Steel Structure Workshop for Production
Pre Engineered Steel Structure Workshop for Production

Pre Engineered Steel Structure Workshop for Production
Pre Engineered Steel Structure Workshop for Production
Pre Engineered Steel Structure Workshop for Production
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2007

Suppliers with verified business licenses

Manufacturer/Factory
Number of Employees
912
Year of Establishment
2002-06-13